Construction Public Notice

2712 Telegraph Ave., Berkeley CA

Project Description:

• Construction of a 6-story building, consisting of 67 residential units, a ground level lobby, and commercial space.

Construction Activities: Major phases of construction to include the following –

• Demo of existing buildings and hardscape.

• Excavation and grading to follow for preparation of the building foundation.

• Underground utilities.

• Forming and subsequent pouring of concrete foundation, walls, and podium slabs.

• Six stories of vertical framing including exterior and interior building finishes.

• Site improvements including landscape, sidewalks, etc.

• Daily construction activities one can expect are use of hand tools (hammer, drills, etc.), hauling and hoisting of material, construction equipment such as crane, bobcats, backhoes, reach lifts, compressors, etc.

Anticipated General Schedule and Construction Phases with Noise Level:

• Demo/Grading (September 2026 – October 2026) – Avg dBA level 83

• Concrete Construction (November 2026 - February 2027) – Avg dBA level 88

• Framing (January 2027 – April 2027) – Avg dBA level 88

• Façade and Finishes (April 2027 – August 2028) – Avg dBA level 88

• Site Improvements, Landscape, Sidewalk, etc. (April 2027 – August 2028) – Avg dBA level 88

Daily Construction Schedule:

• Work will Commence 7am-6pm Monday through Friday

• This project is approved for Saturday work if needed 9am – 4pm.

• Expected Start: September 2026

• Expected Completion: August 2028

Noise Management Individuals:

• Emilio Ponce – (510) 307-5678 Ex. 150 – Construction Noise Liaison